Skip to content
LYONHOMES

Renovations

Bathrooms, kitchens and interiors.

The same team and the same written scope as a full build, on a smaller footprint. Tiled wet areas, cabinetry, flooring, lighting and paint.

Bathroom renovation, marble tile and floating vanity

Okotoks

Basement renovation

An open basement with the structural post boxed square, a walnut slat wall run floor to ceiling, and closets built in rather than bought.

Open basement with a walnut slat wall
Walnut slat feature wall
Hallway, structural post boxed square
Built in closet

SE Calgary

Basement renovation

A family basement rather than a rental suite: open rec room, wet bar with cabinetry and floating shelves, open stair with wood treads, and a full bathroom finished in marble tile.

Wet bar, rec room and open stair
Bathroom in marble tile

What you get

A renovation is a demolition with a deadline.

The difference between a renovation that takes three weeks and one that takes three months is almost always sequencing. Tile arriving after the tiler, a vanity ordered once the plumber has gone, a paint day that lands on a day the floor is being laid.

We order the selections before demolition starts, and we schedule every stage in the order the work actually needs it. It is unglamorous and it is the whole job.

  • 01Selections confirmed and ordered before anything is torn out
  • 02One stage at a time, in sequence
  • 03Dust control and daily clean down in a house you are still living in
  • 04Fixed price, with anything found behind the wall priced before it is built

The money is agreed before the work is.

You get a written scope and a fixed price before anyone picks up a tool, and the payment terms are set out in that same document. Nothing about the money gets worked out while the job is running.

Book a free site visit.

We see every property in person before quoting. You get a fixed price in writing, for a scope you can read line by line.